用户名 密码 记住 注册 忘记密码
在线反馈,给我们提建议
爱思英语在线听写频道
您当前的位置:爱思我秀 > 全部资料分类 > 新概念 > 口语训练:新概念第二册:lesson64 > 录音作品列表 > zebrabear的口语练习录音作品

口语训练:新概念第二册:lesson64

上传时间:2016-07-19 18:14   录音时长:1分24秒

Get the Flash Player to see this player.

得分:0

已收听874次

分享到: 更多

0人总共评分得:(0分)

评分规则:
1、对未评分项首次评分,最低分限制为50,最高分为80;
2、如果对已有分数的项进行评分操作,评委评出的分数对原有分数的影响为30%,一般用户评出的分数对原有分数的影响为10%。
  • 发音:
    0
  • 语调:
    0
  • 语速:
    0
  • 流利:
    0
  • 音质:
    0
  • (网友互评,登录用户可参与评分)

资料原文 |

Why was the first tunnel not completed?

In 1858, a French engineer, Aime Thome de Gamond, arrived in England with a plan for a twenty-one-mile tunnel under the English Channel. He said that it would be possible to build a platform in the centre of the Channel. This platform would serve as a port and a railway station. The tunnel would be well-ventilated if tall chimneys were built above sea level. In 1860, a better plan was put forward by an Englishman, William Low. He suggested that a double railway-tunnel should be built. This would solve the problem of ventilation, for if a train entered this tunnel, it would draw in fresh air behind it. Forty-two years later a tunnel was actually begun. If, at the time, the British had not feared invasion, it would have been completed. The world had to wait almost another 100 years for the Channel Tunnel. It was officially opened on March 7,1994, finally connecting Britain to the European continent.

我要评论

作品评论(共0条)

   0   
请登录以后发表您的看法

zebrabear其他的录音作品

共74个作品 [查看全部]

参与本期训练的其他网友 共5人

点击查看沙漠绿洲的作品 点击查看咸鱼眼泪的作品 点击查看daming1988的作品 点击查看jiamei的作品